Demolition and reconstruction of a 41,000 sq. ft. steel reinforcement distribution center and construction of a new 25,000 sq. ft. steel girder distribution center, including excavation, formwork, erection of the building's steel structure and construction of two overhead cranes.
Location:
5550 Maurice-Cullen Street, Laval